Please select and order
€98.22
excl. VAT
Add to cart
Norm
ÖNORM EN 1028-2
Issue date: 2003 01 01
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements
This European Standard covers verification of the general and safety requirements of fire-fighting
centrifugal pumps with primer as specified in clauses 7 and 8 of EN 10...
Withdrawn: 2008 06 01
§ Legal References
Publisher:
Austrian Standards International
Format:
Digital | 30 Pages
Language:
German
| English
Currently valid:
Optionally co-design standards:
ICS
This European Standard covers verification of the general and safety requirements of fire-fighting
centrifugal pumps with primer as specified in clauses 7 and 8 of EN 1028-1:2002.
NOTE The tests can also be applied to pumps with nominal delivery rates greater than 6 000 l/min.
This standard does not apply to verification related to installation.
This standard does not apply to fire-fighting centrifugal pumps with primer that are manufactured
before the date of publication by CEN of this standard.
ÖNORM EN 1028-2
2008 06 01
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general ...
Norm
ÖNORM EN 1028-2
2003 01 01
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general ...
Norm
↖
Norm
Issue date :
2008 09 01
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 1: Classification - General and safety requirements
Norm
Issue date :
2007 11 01
Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges
Norm
Issue date :
1996 08 01
Stainless steel tubes - Dimensions, tolerances and conventional masses per unit length (ISO 1127:1992)
Norm
Issue date :
2004 03 01
Safety of machinery - Basic concepts, general principles for design - Part 1: Basic terminology, methodology (ISO 12100-1:2003)
Norm
Issue date :
2008 06 01
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements