Please select and order
€132.03
excl. VAT
Add to cart
Technische Regel

ÖVGW G E813

Issue date: 2019 06

Electrical insulation section points - Installation and location

This guideline is valid for the installation and location of factory-made and ready to install electrical insulation section points and valves with integrated insulation ...
Valid
Publisher:
Österreichische Vereinigung für das Gas und Wasserfach
Format:
Digital | 20 Pages
Language:
German
This guideline is valid for the installation and location of factory-made and ready to install electrical insulation section points and valves with integrated insulation section joint in natural gas pipeline facilities according the Natural Gas Law and gases described in in the OVGW-guideline G 31.
ÖVGW G E813
2019 06
Electrical insulation section points - Installation and location
Technische Regel
ÖVGW G 24
2007 02
Electrical insulation spots - Installation and Situation
Technische Regel