Please select and order
€50.25
excl. VAT
Add to cart
Norm
ÖNORM EN 1592-1
Issue date: 1997 12 01
Aluminium and aluminium alloys - HF seam welded tubes - Part 1: Technical conditions for inspection and delivery
This part of EN 1592 specifies the technical conditions for inspection and delivery of HF seam
welded aluminium tubes.
I
It is applicable to HF seam welded tubes obtai...
Valid
Publisher:
Austrian Standards International
Format:
Digital | 14 Pages
Language:
German
| English
| Download GER/ENG
ICS
This part of EN 1592 specifies the technical conditions for inspection and delivery of HF seam
welded aluminium tubes.
I
It is applicable to HF seam welded tubes obtained by foning cold-rolled strips. i
I
It is applicable to aluminium tubes produced from uncoated aluminium strip, as well as to tubing
that is pre-lacquered, pre-painted or pre-anodized prior to foning.
ÖNORM EN 1592-1
1997 12 01
Aluminium and aluminium alloys - HF seam welded tubes - Part 1: Technical conditions for inspection ...
Norm
↖
Norm
Issue date :
2002 01 01
Metallic materials - Tensile testing - Part 1: Method of test at ambient temperature
Norm
Issue date :
1997 12 01
Aluminium and aluminium alloys - HF seam welded tubes - Part 2: Mechanical properties
Norm
Issue date :
1997 12 01
Aluminium and aluminium alloys - HF seam welded tubes - Part 3: Tolerances on dimensions and form for circular tubes
Norm
Issue date :
1997 12 01
Aluminium and aluminium alloys - HF seam welded tubes - Part 4: Tolerances on dimensions and form for square, rectangular and shaped tubes
Norm
Issue date :
1994 12 01
Aluminium and aluminium alloys - Wrought products - Temper designations
Norm
Issue date :
2007 12 01
Aluminium and aluminium alloys - Chemical composition and form of wrought products - Part 3: Chemical composition and form of products
Norm
Issue date :
2008 12 01
Aluminium and aluminium alloys - Chemical composition and form of wrought products - Part 3: Chemical composition and form of products
Norm
Issue date :
2022 11 15
Central gas distribution plants- Part 3: Pipelines between gas distribution plants and consumption connexions