Please select and order
€160.20
excl. VAT
Add to cart
Norm

ÖNORM EN 13232-9

Issue date: 2012 08 15

Railway applications - Track - Switches and crossings - Part 9: Layouts

The scope of this part is: - to describe the design process of switches and crossings, and the use of the other parts of this standard; - to define the main criteria to...
Withdrawn: 2014 05 15
Publisher:
Austrian Standards International
Format:
Digital | 78 Pages
Language:
German | English | Download GER/ENG
Optionally co-design standards:
The scope of this part is: - to describe the design process of switches and crossings, and the use of the other parts of this standard; - to define the main criteria to be taken into account during the design of the layout, including the safety and functional dimensions as well as geometrical and material aspects; - to define the main criteria to be verified during the design approval; - to define the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a ´´kit´´ form; - to determine the limits of supply; - to define the minimum requirements for traceability. This European Standard applies only to layouts that are assembled in the manufacturing plant or that are assembled for the first time at trackside. Other aspects such as installation and maintenance also influence performance; these are not considered as part of this European Standard.
ÖNORM EN 13232-9
2023 12 01
Railway applications - Track - Switches and crossings for Vignole rails - Part 9: Layouts
Norm
ÖNORM EN 13232-9
2014 05 15
Railway applications - Track - Switches and crossings - Part 9: Layouts
Norm
ÖNORM EN 13232-9
2012 08 15
Railway applications - Track - Switches and crossings - Part 9: Layouts
Norm
ÖNORM EN 13232-9
2006 07 01
Railway applications - Track - Switches and crossings - Part 9: Layouts
Norm
Expand
Norm
ÖNORM EN 13145
Issue date : 2012 06 01
Railway applications - Track - Wood sleepers and bearers
Norm
ÖNORM EN 13230-4
Issue date : 2009 11 15
Railway applications - Track - Concrete sleepers and bearers - Part 4: Prestressed bearers for switches and crossings
Norm
ÖNORM EN 13232-3
Issue date : 2012 06 01
Railway applications - Track - Switches and crossings - Part 3: Requirements for wheel/rail interaction
Norm
ÖNORM EN 13232-2
Issue date : 2012 01 01
Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
Norm
ÖNORM EN 13674-1
Issue date : 2011 06 01
Railway applications - Track - Rail - Part 1: Vignole railway rails 46 kg/m and above
Norm
ÖNORM EN 13232-6
Issue date : 2012 01 01
Railway applications - Track - Switches and crossings - Part 6: Fixed common and obtuse crossings
Norm
ÖNORM EN 13232-5
Issue date : 2012 12 01
Railway applications - Track - Switches and crossings - Part 5: Switches
Norm
ÖNORM EN 13232-4
Issue date : 2012 06 01
Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
Norm
ÖNORM EN 13715
Issue date : 2010 12 01
Railway applications - Wheelsets and bogies - Wheels - Tread profile
Norm
ÖNORM EN 13232-7
Issue date : 2012 12 01
Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts
Norm
ÖNORM EN 13674-4
Issue date : 2011 09 01
Railway applications - Track - Rail - Part 4: Vignole railway rails from 27 kg/m to, but excluding 46 kg/m
Norm
ÖNORM EN 13674-3
Issue date : 2010 09 01
Railway applications - Track - Rail - Part 3: Check rails
Norm
ÖNORM EN 13674-2
Issue date : 2012 08 15
Railway applications - Track - Rail - Part 2: Switch and crossing rails used in conjunction with Vignole railway rails 46 kg/m and above
Norm
ÖNORM EN 13232-8
Issue date : 2012 01 01
Railway applications - Track - Switches and crossings - Part 8: Expansion devices
Norm
ÖNORM EN 13232-9
Issue date : 2014 05 15
Railway applications - Track - Switches and crossings - Part 9: Layouts