Please select and order
€72.72
excl. VAT
Add to cart
Norm
ÖNORM B 5037
Issue date: 2019 07 01
Vitrified clay pipe systems for drains and sewers - Procedures of the factory production control and third-party certification - National implementation of ÖNORM EN 295 (all parts)
This standard describes requirements for the quality assurance of industrially manufactured vitrified clay pipe systems for sewers and pipes including pipes, manholes, fi...
Valid
Publisher:
Austrian Standards International
Format:
Digital | 13 Pages
Language:
German
Optionally co-design standards:
This standard describes requirements for the quality assurance of industrially manufactured vitrified clay pipe systems for sewers and pipes including pipes, manholes, fittings, perforated pipes and jacking pipes and other related components.
Parameters for the static calculation according to ÖNORM B 5012 are given in the informative Annex A and recommended conformity criteria in the informative Annex B.
The present document can be applied to vitrified clay pipe systems complying with the basic requirements of ÖNORM EN 295 (all parts).
ÖNORM B 5037
2019 07 01
Vitrified clay pipe systems for drains and sewers - Procedures of the factory production control and...
Norm
↖
ÖNORM B 5037
2014 04 15
Vitrified clay pipe systems for drains and sewers - Third-party certification procedures - National ...
Norm
Norm
Issue date :
2013 04 01
Vitrified clay pipe systems for drains and sewers - Part 1: Requirements for pipes, fittings and joints
Norm
Issue date :
2013 04 01
Vitrified clay pipe systems for drains and sewers - Part 2: Evaluation of conformity and sampling
Norm
Issue date :
2012 03 01
Vitrified clay pipe systems for drains and sewers - Part 3: Test methods
Norm
Issue date :
2013 05 15
Vitrified clay pipe systems for drains and sewers - Part 4: Requirements for adaptors, connectors and flexible couplings
Norm
Issue date :
2013 04 01
Vitrified clay pipe systems for drains and sewers - Part 5: Requirements for perforated pipes and fittings
Norm
Issue date :
2013 04 01
Vitrified clay pipes systems for drain and sewers - Part 6: Requirements for components of manholes and inspection chambers
Norm
Issue date :
2013 04 01
Vitrified clay pipe systems for drains and sewers - Part 7: Requirements for pipes and joints for pipe jacking
Norm
Issue date :
2007 07 01
Elastomeric seals - Material requirements for pipe joint seals used in water and drainage applications - Part 4: Cast polyurethane sealing elements